Turnkey Contract

Publication date:
March, 2003
Model forms
Hard copy languages:
English, Spanish, French
Hard copy


Orgalime issued a new standard contract – the Orgalime turnkey contract for industrial works – our most comprehensive contract publication to date.
Why this new standard contract? In the first place because Orgalime’s scope of General Conditions and model contract forms needed to be completed by a turnkey contract covering the delivery of complete industrial installations or plants. These are often complex installations and works; contracts must therefore both be flexible and complete. Purchasers and contractors in the engineering sector who have used existing models, have generally found them not well suited to their needs: they are often conceived less for industrial works than for civil engineering contracts and are very complex, and sometimes also very one sided.
The new publication is provided in a package, which includes General Conditions, a Model Contract, a checklist and a CD-ROM. The parties can easily adapt their contract to suit the individual situation. By filling in the checklist, they can clearly allocate the responsibility for every type of auxiliary work task to the contractor or the purchaser, while the contractor remains firmly responsible for, and in control of, the technical functions of the works. This provides both considerable flexibility and clarity.

Latest Tweets

Follow us on Twitter
RT @FEM_EUR: RT @FEM_EUR: FEM welcomes the measures proposed by @EU_Growth to reinforce market surveillance in the #EU. Check our position paper https:/…
4 hours 50 min ago
RT @OrgalimeENVI: RT @OrgalimeENVI: "One market-one Europe", our past and our future! A functioning #SingleMarket is as much a benefit for EU citizens as it…
6 hours 30 min ago
Want to keep up with all the latest on the EU policies impacting the engineering and tech sectors? Sign up for our… https://t.co/7MSA1hV0oV
8 hours 53 min ago